Ski Resorts News
08/22/2017
The adventure mountain of Grindelwald has added another adventure. The First Eagle Glider was opened on Friday, 4 August, 2017 at just under 2,000 metres above sea level. The flight attraction is unique in Switzerland.

The rapid flight with the First Glider soars like an eagle from Schreckfeld station up to First and back again. With speeds of up to 83 km/h, four people can fly through the air like a hang glider.
Faster than all others
With the new attraction on First, Jungfrau Railways is responding to the steadily increased demand for activities on their adventure mountain. The First Glider runs parallel to the existing First Flyer, with guests distributed over both. The attraction from Austria is the first ever in Switzerland. There are only eight other installations of this type worldwide. Compared to its rivals, the First Glider impresses with its above-average high flight speed of 72 km/h uphill and 83 km/h downhill. From Saturday, 5 August 2017, it will be available to all adventurers aged 10 years and up and at least 130 cm tall, all year round. A flight costs 29 francs for adults and CHF 22 for children (not including train ride).
With the new attraction on First, Jungfrau Railways is responding to the steadily increased demand for activities on their adventure mountain. The First Glider runs parallel to the existing First Flyer, with guests distributed over both. The attraction from Austria is the first ever in Switzerland. There are only eight other installations of this type worldwide. Compared to its rivals, the First Glider impresses with its above-average high flight speed of 72 km/h uphill and 83 km/h downhill. From Saturday, 5 August 2017, it will be available to all adventurers aged 10 years and up and at least 130 cm tall, all year round. A flight costs 29 francs for adults and CHF 22 for children (not including train ride).
Fully integrated
A drive building and operating building were built on Schreckfeld for the construction of the Glider. On First, only a corner post was necessary for the installation. The facility runs parallel to the First Flyer and the aerial gondola, so it's fully integrated into the landscape. Construction of the First Glider took two months. Project costs amounted to approximately 1.5 million Swiss francs. With the new offer, Jungfrau Railways is strengthening the positioning of Grindelwald-First as "Top of Adventure". At the same time, the existing range of experiences from First to Grindelwald with the First Flyer, Mountain Carts and Trotti-Bikes, is now even more varied with the First Eagle Glider.
A drive building and operating building were built on Schreckfeld for the construction of the Glider. On First, only a corner post was necessary for the installation. The facility runs parallel to the First Flyer and the aerial gondola, so it's fully integrated into the landscape. Construction of the First Glider took two months. Project costs amounted to approximately 1.5 million Swiss francs. With the new offer, Jungfrau Railways is strengthening the positioning of Grindelwald-First as "Top of Adventure". At the same time, the existing range of experiences from First to Grindelwald with the First Flyer, Mountain Carts and Trotti-Bikes, is now even more varied with the First Eagle Glider.
Technical details on the First Eagle Glider
Flight length: 800 m
Difference in altitude: 220 m
Descent: 23 m/s (83 km/h)Ascent: 20 m/s (72 km/h)
Special design Capacity: 4 persons/trip; approx. 60 - 70 persons/h
Target group: from 10 years of age, at least 130 cm tall
Operation: Summer & Winter, -15 °C to +50 °C, up to 55 km/h wind speed
Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026